Projects PROJECT NAME: REGIONAL CONNECTOR TRANSIT CORRIDORCLIENT: SkanskaCOST: $1.47 BILLION Delta Highlights Provided static and dynamic geotechnical recommendations for the stations and cut and cover structuresGeomechanical numerical analyses performed for the project to analyze seismic racking behavior of the underground structuresAdjacent buildings settlement analyses due to deflection of the shoring. The analyses were used in support of development of building projection plan PROJECT NAME: GERALD DESMOND BRIDGE REPLACEMENTCLIENT: Shimmick, FCC,Impregilo J VCOST: $1 Billion Delta Highlights Performed site-specific non-linear time history seismic analysis for main span structure.Served as Environmental compliance manager Contaminant plume modeling and analysis during the construction phase.Geotechnical Engineer of Record and review of seismic and foundation reports PROJECT NAME: STATE ROUTE 91 IMPROVEMENTCLIENT: ParsonsCOST:$1.4 Billion Delta Highlights Developed post advanced planning study geotechnical data reports for bridges.Provided daily review of design-build contractors submittals.All work performed under formal QA/QC program in accordance with ISO 9000.Provided quality control materials testing and inspection. PROJECT NAME: MTA EXPOSITION LIGHT RAIL PHASE 2CLIENT: Parsons Brinkerhoff Design- Skanska-Rados Joint VentureCOST: $1.5 Billion Delta Highlights Materials evaluation of 1920’s brick arch tunnel under light rail road.Provided geotechnical recommendations for Expo LRT stations over Sepulveda Blvd. and centinela.Multiple Mechanical Stabilized Earth (MSE) light rail walls. PROJECT NAME: LAUSD DORSEY HIGH SCHOOLCLIENT: Los Angeles UnifiedSchool DistrictCOST: $28 Million Delta Highlights Provided materials testing for Los Angeles Unified School District’ s First Design-Build Project.Geotechnical oversight provided through the construction.Quality control inspection services. PROJECT NAME: WORKS SUPERVISION FOR THE TICHIHAFDAM WATER TRANSFER PROJECT INBEJAIA WILAYACLIENT: Ministry of Water Resources – National Dam andTransfer AuthorityCOST: $3.8 MILLION Delta Highlights The Tichi-Haf water transfer system is a hydraulic complex consisting of the following main structures:the Tichi-Haf dam and an upstream pipe up to a treatment plant;a treatment plant with a production capacity of 1.5m3/s (130,000 m3/d) and chlorination stations; the major supply main (13 km length; 1,800 mm diameter steel pipe);tunneling on 180 m on rivers crossing (over and under); reservoirs with capacities ranging from 1,500 to 10,000m3; valve chambers; electric equipment; two by-passes. PROJECT NAME: Relevant experience in Rural and Urban Water Supply and Sanitation, in Northern and Sub-saharian Africa Delta Highlights View Projects